PROJECT HIGHLIGHTS
Architect
Jonathan Levi Architects
Value
$78.6 Million
​
Size
188,400 SF
​
Complete
August 2021
The project consists of the construction of a 188,400 square foot middle-high school located on a 40-acre site. The building consists of four components with common areas in its center, the high school on the west end of the building, a middle school on the east end, and an athletics wing.
​
Our services included Fire Protection, Plumbing, HVAC, Electrical, Security, and Technology systems engineering. Also, we provided the Technology Equipment Procurement for audio/visual, computer, network switches & WAP, and telephone systems.
​
Sustainable features include high-efficiency plumbing fixtures and gas-fired water heater, high-efficiency gas-fired condensing boiler plant, energy recovery air handling units, displacement ventilation system, DDC automatic temperature control and building energy management system, energy-efficient lighting, and lighting controls, addressable fire alarm system with mass notification, intrusion, and closed-circuit television system.
​
LEED Certification is in progress.
Westport Middle-High School
Location:
400 Old County Road, Westport, MA 02790